Engineering Analysis
Does the design close?
The design violates 11 critical constraints. It cannot succeed as configured.
Total mass
0.0 kg
100% margin
Power margin
0%
0 W gen / 0 W use
Cost
100 MC
92% reserve
Data delivered
0%
0 kB/day link
Reliability
0.0%
Readiness / risk
0%
Very high risk (100)
Resource utilisation (100% = limit)
Power budget by subsystem (orbit-average W)
Select components to see the power budget.
Green line: total orbit-average generation (0 W) — individual bars should sum below it.
Engineering findings
11 crit · 0 major · 0 minorScienceNo scientific objective selected.
Fix: Choose an objective in Mission Briefing.
LaunchNo launch vehicle selected.
Fix: Select a launch vehicle in Mission Architecture.
GroundNo ground station selected — no data can reach Earth.
Fix: Add at least one ground station.
Bus & StructureMissing critical subsystem: Bus & Structure.
Fix: Select a bus & structure component.
Science InstrumentsMissing critical subsystem: Science Instruments.
Fix: Select a science instruments component.
Power GenerationMissing critical subsystem: Power Generation.
Fix: Select a power generation component.
Energy StorageMissing critical subsystem: Energy Storage.
Fix: Select a energy storage component.
CommunicationsMissing critical subsystem: Communications.
Fix: Select a communications component.
Thermal ControlMissing critical subsystem: Thermal Control.
Fix: Select a thermal control component.
Attitude ControlMissing critical subsystem: Attitude Control.
Fix: Select a attitude control component.
Avionics & ComputingMissing critical subsystem: Avionics & Computing.
Fix: Select a avionics & computing component.
Calculation sheet
Simplified calc| Dry mass | 0.0 kg | Σ component masses |
| Mass with contingency | 0.0 kg | dry × 1.10 |
| Mass allowance | 150 kg | min(campaign 150 kg, launcher capacity to orbit) |
| Remaining mass | 150.0 kg | allowance − mass with contingency |
| Peak generation | 0 W | array nameplate in full sun |
| Orbit-average generation | 0.0 W | peak × array factor × (1 − eclipse 37%) |
| Power consumption | 0.0 W | Σ subsystem power + Σ instrument power × duty |
| Power margin | 0% | (generation − consumption) / consumption |
| Instrument availability | 100% | power and battery limited operating fraction |
| Eclipse duration | 35 min | worst-case cylindrical shadow, β = 0 |
| Required battery | 0 Wh | consumption × eclipse / DoD 30% |
| Energy storage | 0 Wh | selected battery |
| Science data | 0 kB/day | Σ rate × duty × availability × 86 400 s |
| Contact time | 0 min/day | Σ station visibility for this inclination |
| Downlink capacity | 0 kB/day | 0 kbps × contact × 75% link efficiency |
| Spacecraft reliability | 100.0% | Π component reliability × radiation factor 1 |
| Mission reliability | 0.0% | spacecraft × launch vehicle |
| Orbital lifetime | 240 months | drag decay estimate + propulsion Δv / drag make-up |
| Total cost | 100 MC | spacecraft 0 + launch 0 + ground 0 + ops 100 |
Simplified educational models: two-body orbit, worst-case eclipse, tabulated drag lifetime, series reliability. Not suitable for real mission design.