ASA MUZN logoMUZN ASA

Engineering Analysis

Does the design close?

A deterministic engine evaluates your design. Same design, same result — no dice rolls. Simplified calc
infeasible

The design violates 11 critical constraints. It cannot succeed as configured.

Total mass

0.0 kg

100% margin

Power margin

0%

0 W gen / 0 W use

Cost

100 MC

92% reserve

Data delivered

0%

0 kB/day link

Reliability

0.0%

Readiness / risk

0%

Very high risk (100)

Resource utilisation (100% = limit)

Power budget by subsystem (orbit-average W)

Select components to see the power budget.

Green line: total orbit-average generation (0 W) — individual bars should sum below it.

Engineering findings

11 crit · 0 major · 0 minor
  • ScienceNo scientific objective selected.

    Fix: Choose an objective in Mission Briefing.

  • LaunchNo launch vehicle selected.

    Fix: Select a launch vehicle in Mission Architecture.

  • GroundNo ground station selected — no data can reach Earth.

    Fix: Add at least one ground station.

  • Bus & StructureMissing critical subsystem: Bus & Structure.

    Fix: Select a bus & structure component.

  • Science InstrumentsMissing critical subsystem: Science Instruments.

    Fix: Select a science instruments component.

  • Power GenerationMissing critical subsystem: Power Generation.

    Fix: Select a power generation component.

  • Energy StorageMissing critical subsystem: Energy Storage.

    Fix: Select a energy storage component.

  • CommunicationsMissing critical subsystem: Communications.

    Fix: Select a communications component.

  • Thermal ControlMissing critical subsystem: Thermal Control.

    Fix: Select a thermal control component.

  • Attitude ControlMissing critical subsystem: Attitude Control.

    Fix: Select a attitude control component.

  • Avionics & ComputingMissing critical subsystem: Avionics & Computing.

    Fix: Select a avionics & computing component.

Calculation sheet

Simplified calc
Dry mass0.0 kg
Mass with contingency0.0 kg
Mass allowance150 kg
Remaining mass150.0 kg
Peak generation0 W
Orbit-average generation0.0 W
Power consumption0.0 W
Power margin0%
Instrument availability100%
Eclipse duration35 min
Required battery0 Wh
Energy storage0 Wh
Science data0 kB/day
Contact time0 min/day
Downlink capacity0 kB/day
Spacecraft reliability100.0%
Mission reliability0.0%
Orbital lifetime240 months
Total cost100 MC

Simplified educational models: two-body orbit, worst-case eclipse, tabulated drag lifetime, series reliability. Not suitable for real mission design.